1. Introduction

1.1 Context

ITPEnergised (ITP) has been appointed by Berwick Bank Wind Farm Ltd (The Client) to provide support and input to the onshore component of the Environmental Impact Assessment Report (EIAR) submission to support a planning application for the onshore transmission works in connection with the Berwick Bank Windfarm.

This Flood Risk Assessment (FRA) has been prepared as Technical Appendix 1 to Chapter 11: Geology, Hydrology, Soils & Flood Risk within the onshore EIAR. The purpose of this report is to outline any potential flood risks to the Proposed Development, the impact of the Proposed Development on flood risk elsewhere, and the proposed measures which could be incorporated to mitigate any identified flood risk.

The Site has been visited by an experienced ITP Hydrologist and Civil Engineer on several occasions between 2020 and 2022 to inform this assessment.

1.2 Policy and Guidance

This assessment has been completed in accordance with guidance presented within the National Planning Framework for Scotland 4 (NPF4)[1] (which superseded Scottish Planning Policy (SSP) and NPF3) and taking cognisance of the Flood Risk Management (Scotland) Act 2009.

The assessment also references and takes due consideration (where appropriate) of the following principal guidance and policy documents:

       CIRIA (2004) Development and Flood Risk – Guidance for the Construction Industry, Report C624;

       East Lothian Council Local Development Plan (2018)

       East Lothian Council Local Development Plan: Strategic Flood Risk Assessment (2018)

       Scottish Environment Protection Agency (2015) Flood Risk and Land Use Vulnerability Guidance (Reference: LUPS-GU24), Version 4, July 2018;

       Scottish Environment Protection Agency (2017) SEPA Development Plan Guidance Note 2a: Development Management Guidance: Flood Risk (Reference: LUPS-DM-GU2a), Version 2, July 2018;

       Scottish Environment Protection Agency (2018) Flood Risk Management Strategy Forth Estuary;

       Scottish Environment Protection Agency (2019) Technical Flood Risk Guidance for Stakeholders (Reference: SS-NFR-P-002) May 2019; and

       The Strategic Development Planning Authority for Edinburgh and South East Scotland (2013) Strategic Development Plan.

 

1.3 Site Location

The site is situated near Torness and the village of Innerwick, south-east of Dunbar located in East Lothian. The centre of the site is OSGB36, British National Grid (BNG) 373977, 674114 and is approximately 598 ha in size.

The extent of the site runs from the settlement of Branxton in the south, Bilsdean in the south-east, the coastline at Skateraw and Torness in the north, Oxwell Mains Cement Works and Quarry in the north-west and Fouracres in the west. The land on which the site is located is predominantly agricultural land with sparse settlements spread throughout, connected by small local roads and tracks. The A1 trunk road and East Coast Main Line (ECML) railway cut through the site in a north-west to south-east direction running parallel to the coast. Torness Power Station (Nuclear) is located to the south-east of the proposed landfall at Skateraw.

1.4 Proposed Onshore Development

The Onshore Transmission Works (OnTW) shall include the following:

       a new onshore substation;

       landfall works;

       onshore cables within a cable corridor between the landfall and the new onshore substation, and between the new onshore substation and the SPEN Branxton substation; and

       associated ancillary infrastructure.

The Branxton substation is being developed by SPEN and is subject to a separate planning application.

1.5 Topography

Ground levels within the site vary due to the scale of the site and the sloping topography towards the coastline. The highest elevations within the site are approximately 120mAOD around the location of the proposed SPEN Branxton substation whilst the lowest elevations are at sea level along the coastline. The topography at the site generally falls in a north eastern direction.

1.6 Geology and Hydrogeology

1.6.1           Geology

1.6.1.1     Superficial

Review of the British Geological Survey (BGS) online geology maps[2] indicates that the superficial deposits within the site extents are predominantly Glaciofluvial deposits consisting of gravel, sand and silt. Areas of alluvial deposits are present along the extents of watercourses and raised marine deposits can be found at the landfall location. There are also some sparse areas of Till further inland where this becomes the predominant deposit (beyond site extents).

1.6.1.2     Bedrock

Review of the BGS online geology maps indicates that the bedrock geology underlying the central and southern areas of the site is the Ballagan Formation consisting of sandstone, siltstone and dolomitic limestone. In the northern area of the site, near to the coastline the underlying bedrock geology is dominated by various limestone units including Hurlet Limestone, Blackhall Limestone and Lower Limestone Formation consisting of limestone, argillaceous rocks and subordinate sandstone.

The bedrock geology in the central and southern areas of the site are part of the Inverclyde Group rock unit whilst the northern area is part of the Strathclyde Group rock unit.

1.6.2           Hydrogeology

Review of the BGS online hydrogeology maps indicates that the site is underlain by moderately productive aquifers where flow is virtually all through fractures and other discontinuities.

SEPA classifications identify the site to be within the Torness Coastal groundwater body and the Torness groundwater body which both have an overall status of Good.

1.7 Hydrological Context

1.7.1           Local Hydrology

The site area is divided into four catchments shown in SEPA’s Baseline Confluence Inter Catchments data file;

       Dry Burn at the mouth

       East Lothian Coastal between Thornton Burn and Dry Burn

       Thornton Burn at the mouth

       East Lothian Coastal between Dunglass Burn and Thornton Burn

The Dry Burn catchment is approximately 19km2 and is classified as being of Moderate status (SEPA, 2020, under the Water Framework Directive). With respect to the Proposed Development, the majority of the onshore cable corridor between the landfall location and new onshore substation is located within this catchment near to its divide with the ‘East Lothian Coastal between Thornton Burn and Dry Burn’ catchment.

The East Lothian Coastal between Thornton Burn and Dry Burn catchment is approximately 4km2. The main watercourse in this catchment is unnamed and originates from the agricultural land to the west of Innerwick and flows to the west and north of the proposed onshore substation location and is not classified by SEPA. This watercourse has been surveyed for the purpose of informing the drainage strategy for the onshore substation and it has been identified that it is heavily modified with multiple culverts and discharges to the Dry Burn to the north of the settlement of Skateraw.

The Thornton Burn catchment is approximately 14km2 and is classified as being of Good status. With respect to the Proposed Development, the majority of the onshore cable corridor between the new onshore substation location and the new SPEN substation at Branxton is located within this catchment. The new SPEN substation location is situated at the confluence point of the upper reaches of the Thornton Burn known as the Braidwood Burn (predominant watercourse) and the Ogle Burn (tributary to the Braidwood Burn).

The East Lothian Coastal between Dunglass Burn and Thornton Burn catchment is approximately 17km2 with no named watercourses present. A short section of proposed access track to the proposed Branxton grid substation is located within the western extents of the catchment. The site boundary extends further east into this catchment however, no further Proposed Development is to be located in this catchment.  

With respect to the Proposed Development, the main watercourses are:

       Dry Burn

       Thornton Burn / Braidwood Burn

       Unnamed Watercourse between Innerwick and Skateraw (hereafter referred to as the Innerwick Burn)

A hydrological summary and catchment characteristics of the main watercourses local to the Proposed Development have been obtained from the FEH Web Service[3] and are shown in Table 1 below.

Table 1 :
Hydrological characteristics of local catchments

Table 1 – Hydrological characteristics of local catchments

1SAAR = Standard Annual Average Rainfall

2URBEXT = Extent of Urban and Suburban Land Cover

3SPRHOST = Standard Percentage Runoff using UK Hydrology of Soil Types (HOST) Classification

4PROPWET = Proportion of Time the Soil Moisture Deficit (SMD) was equal to, or below, 6mm during 1961-1990

The catchments summaries indicate they experience relatively low annual rainfall (for Scottish catchments) and are all essentially completely rural.

2. Planning and Guidance Context

2.1 National Planning Framework

This report has been prepared in accordance with NPF4 Policy 22 relating to Flood Risk and Water Management, which states:

Policy Intent:

To strengthen resilience to flood risk by promoting avoidance as a first principle and reducing the vulnerability of existing and future development to flooding.

Policy Outcomes:

       Places are resilient to current and future flood risk.

       Water resources are used efficiently and sustainably.

       Wider use of natural flood risk management benefits people and nature.”

Furthermore, NP4 states that development proposals at risk of flooding or in a flood risk area will only be supported if they are for:

       “Essential infrastructure where the location is required for operational reasons;

       Water compatible uses;

       Redevelopment of an existing building or site for an equal or less vulnerable use; or.

       Redevelopment of previously used sites in built up areas where the LDP has identified a need to bring these into positive use and where proposals demonstrate that longterm safety and resilience can be secured in accordance with relevant SEPA advice”.

2.2 East Lothian Council Local Development Plan (LDP) 2018

ELC LDP 2018 provides the following policies that are relevant to flood risk assessment.

       “Policy NH9: Water Environment: Where relevant, new development should protect and, where appropriate, enhance the water environment, in line with the Water Framework Directive 2000 (WFD) and the Water Environment and Water Services (Scotland) Act 2003 (WEWS).

Development proposals that would have a detrimental impact on the water environment will not be supported.”

       “Policy NH10: Sustainable Drainage Systems: All development proposals must demonstrate that appropriate provision for Sustainable Drainage Systems (SuDS) has been made at the time of submitting a planning application, except for single dwellings or developments in coastal locations that discharge directly to coastal waters where there is no or a low risk to designated bathing sites and identified Shellfish Waters. Sufficient space for proposed SuDS provision, including the level and type of treatment appropriate to the scheme of Proposed Development, must be safeguarded in site layouts. Provision must also be made for appropriate long-term maintenance arrangements to the satisfaction of the Council.

A drainage assessment may also be required to show the impact of a 1 in 200-year rainstorm event. SuDS schemes should be designed with an allowance for climate change.

Proposals must also demonstrate through a design-led approach how SuDS proposals are appropriate to place and designed to promote wider benefits such as placemaking, green networks and biodiversity enhancement.”

       “Policy NH11: Flood Risk: Development that would be at unacceptable risk of flooding will not be permitted. New development within areas of medium to high risk of coastal or watercourse flooding (with greater than 0.5% annual probability of flooding) should generally be avoided in accordance with the provisions set out in Advice Box 8.

All relevant development proposals will be assessed based on the probability of a flood affecting the site and the nature and vulnerability of the proposed use, taking into account the following:

a) the characteristics of the site and any existing or previous development on it;

b) the design and use of the proposed development, including use of water resistant materials and construction;

c) the size of the area likely to flood;

d) depth of flood water, likely flow rate and path, and rate of rise and duration;

e) the vulnerability and risk of wave action for coastal sites;

f) committed and existing flood protection methods: extent, standard and maintenance regime;

g) the effects of climate change, including an appropriate allowance for freeboard;

h) surface water run-off from adjoining land;

 i) culverted watercourses, drains and field drainage;

j) cumulative effects, especially the loss of storage capacity;

k) cross-boundary effects and the need for consultation with adjacent authorities;

l) effects of flood on access including by emergency services; and

m) effects of flood on proposed open spaces including gardens.

2.3 SEPA Flood Risk and Land Use Vulnerability Guidance

2.3.1           Context

This guidance outlines how SEPA assess the vulnerability to flooding of different land use with the following categories:

       Most Vulnerable Uses;

       Highly Vulnerable Uses;

       Least Vulnerable Uses;

       Essential Infrastructure; and

       Water Compatible uses.

The following paragraphs are extracted from the guidance for context:

“This guidance classifies land uses according to how they are impacted by flooding, i.e. their relative susceptibility and resilience to flooding, and any wider community impacts caused by their damage or loss.

The classification recognises that certain types of development, and the people who use and live in them, are more at risk from flooding than others (e.g. children, the elderly and people with mobility problems that may have more difficulty in escaping fast flowing water).

The term ‘land use vulnerability’ is used in this guidance to differentiate between a range of land uses, taking account of flooding impacts on land uses in terms of their relative susceptibility and resilience to flooding. It also reflects wider community impacts caused by their damage or loss. For example, a police station is not more likely to suffer damage (be susceptible) or less able to recover (be resilient) than a comparable office building. However, it is in a more vulnerable category than an office use because a higher value is placed upon the wider community impacts that would be caused by its potential loss or damage during a flood event. Similar considerations apply to the inclusion of hazardous waste facilities within the highly vulnerable category and other waste treatment facilities being within the less vulnerable category.”

2.3.2           Proposed Development Suitability

With reference to Table 1 (SEPA Land Use Vulnerability Classification)[4] of the guidance the proposed developed is considered Essential Infrastructure category.

With reference to Table 2 (SEPA Matrix of Flood Risk) of the guidance, the proposed Essential Infrastructure development is suitable within any fluvial flood risk zone however for sites located in ‘medium’ to ‘high’ risk (i.e. >0.5% AEP) within sparsely developed and / or undeveloped areas the following criteria applies:

Generally suitable where a flood risk location is required for operational reasons and an alternative lower-risk location, is not available – development should be designed and constructed to be operational during floods (i.e. 0.5% AEP), and not impede water flow.”

3. Flood Risk Assessment

3.1 Sources of Information

3.1.1           National Floodplain Mapping and Risk Assessment

Strategic level information regarding the current flood risk at the Site has been obtained from SEPA via the online Indicative Flood map and National Flood Risk Assessment (NFRA) Portal[5].

3.1.2           Mapping and Terrain Data

Ordnance Survey (OS) Mapping, LiDAR data, the site topographic survey and satellite imagery have been used to set the context of the application site and its immediate surroundings.

3.1.3           Historic Flooding

A focussed internet search was undertaken to identify any significant historical flooding events with the vicinity of the site.

3.1.4           Strategic Flood Risk Assessment

The East Lothian Council Strategic Flood Risk Assessment (SRFA)[6] has been reviewed with respect to sources of flooding within the vicinity of the site.

3.2 Screening Assessment

A Screening Assessment is used to identify if any sources of flood risk require a more detailed analysis and specification of bespoke mitigation measures.

The assessment has been undertaken with consideration of the three main infrastructure elements:

       Landfall Infrastructure

       Onshore Cable Route

       Onshore Substation

There are a number of potential sources of flooding which have been evaluated in accordance with best practice and NPF4 such as:

       Flooding from rivers or fluvial flooding;

       Flooding from the sea or tidal / coastal flooding;

       Flooding from land;

       Flooding from groundwater;

       Flooding from sewers; and

       Flooding from infrastructure failure / blockage (e.g., reservoirs, canals, and other artificial sources.

The flood risk from each of these potential sources is discussed in the following Tables 2-4.

 

Table 2 :
Landfall Infrastructure Flood Risk Screening Assessment

Table 2 – Landfall Infrastructure Flood Risk Screening Assessment

 

Table 3 :
Onshore Cable Route Flood Risk Screening Assessment

Table 3 – Onshore Cable Route Flood Risk Screening Assessment

 

Table 4 :
Onshore Substation Flood Risk Screening Assessment

Table 4 – Onshore Substation Flood Risk Screening Assessment

 

 

3.3 Flood Risk Screening Assessment Review

Based on the outcome of assessments in Table 2, 3 & 4 the following risks shown in the below Table are to be assessed further.

       Flooding from the sea or tidal / coastal flooding with respect to the landfall location

       Fluvial flooding with respect to watercourse crossings for the onshore cable route

       Flooding from land (overland flow) to the proposed substation – mitigation and discussion of this is provided in EIAR Appendix 11.2 (Drainage Strategy Report).

All outcomes detailed above are risk to the Proposed Development. The screening assessment confirms that no risk from the Proposed Development require further assessment.

3.4 Further Assessment

3.4.1           Landfall Location Coastal Flood Assessment

SEPA flood maps indicate that the landfall location may be partially located within an area at risk of coastal flooding. As such an estimate has been undertaken of the coastal flood extent to quantify the risk to the landfall location throughout the lifetime of the development of 35 years.

As part of this assessment, the vulnerability of the landfall infrastructure has been evaluated by SSE-R with respect to potential future flooding. It was concluded that buried cables and transition joints bays at the landfall location would be resilient to flooding once installed (given that the infrastructure will be underground) which meets the Land Use Vulnerability Requirements set out in Section 2.3.2.

A conservative flood extent has been developed based on the Coastal Flood Boundary (CFB) Model. Table 5 provides a summary of the development of the design level coastal flood extent.

Table 5 :
Coastal Flood Design Level

Table 5 – Coastal Flood Design Level

 

Drawing 001 shows the estimated design coastal flood extent in relation to the landfall location. This assessment indicates that there is likely to be some transition joint bay infrastructure located marginally seaward of the design flood level.

In addition, the Dynamic Coast dataset has been assessed to consider any future coastal erosion at the landfall location. No anticipated coastal erosion is mapped within the vicinity of the landfall location.

Taking the above into account, the residual risk to the buried landfall infrastructure (cables and transition joint bays) is ‘low’. Despite there being some overlap with the predicted coastal flood level, the infrastructure will be made flood resilient (ensuring any access points to underground infrastructure are sealed and protect from water ingress) so that it remains safe and operational for the development lifetime.

3.4.2           Watercourse Crossing Flood Assessment: Innerwick Burn

As previously described, a watercourse crossing is proposed over the Innerwick Burn immediately upstream of its discharge location to the Dry Burn. The proposed crossing is to utilise an existing 900mm diameter culvert beneath a track access. In order to accommodate the cable route, this existing culvert would be lengthened on both sides by approximately 5m.

SEPA generally prefer alternative solutions to culvert crossings unless adequate justification is provided. In this instance it is believed that there is suitable justification in that the crossing is to be located on a minor unnamed watercourse (called Innerwick Burn for reporting purposes only), utilising an existing culvert albeit with a short extension required, to facilitate an Essential Infrastructure project and associated cable route infrastructure.

The extension of the culvert may have the potential to exacerbate any existing flooding issue with the culvert. As previously discussed, the Innerwick Burn has been heavily modified with multiple culverts upstream of this location. These culverts have been subject to a site survey and culvert survey (to inform the proposed substation drainage strategy). A series of culverts route the burn through the settlement of Skateraw and the downstream exit point of this system (immediately upstream of the proposed crossing location) has been surveyed and found to be an 800mm diameter concrete pipe. As this pipe diameter is less than the proposed extended culvert diameter, its capacity is less and any potential flood risk within the burn will be further upstream where the capacity reduces. There is a limited short section of open watercourse between the Skateraw culvert exit point and the proposed extended culvert and thus negligible additional runoff would enter the downstream culvert. As such the culvert extension does not pose any material increased flood risk as the Skateraw culvert is more susceptible to flooding due to its smaller diameter and capacity. In addition, the smaller diameter upstream culvert reduces the risk of potential blockages to the proposed extended culvert from upstream debris and considering the short section of open watercourse between the two culverts, the overall blockage risk of the proposed extended culvert is very low.

This Further Assessment therefore shows that there is negligible risk to the onshore cable route watercourse crossing at this location with respect to fluvial flooding.  

3.4.3           Watercourse Crossing Flood Assessment: Braidwood Burn

As previously described, it is proposed to construct a cable route bridge over the Braidwood Burn due to the challenging topography making the typical open cut trench method or HDD techniques unviable. The proposed bridge will include a bottomless arch culvert to convey flows within the Braidwood Burn. SEPA’s guidance on watercourse crossings states that they should follow best practice guidelines[7] and be able to convey the 1 in 200-year flow. As such, an assessment of the proposed culvert capacity in comparison with the anticipated 1 in 200-year flow within the Braidwood Burn is required to determine any potential flood risk associated with the crossing.

3.4.3.1     Braidwood Burn Peak Flow Assessment

An estimate of the peak flow within the Braidwood Burn at the proposed crossing location has been undertaken using catchment characteristics obtained from the FEH Web Service in combination with the industry standard Revitalised Flood Hydrograph V.2 (ReFH2) software.

The estimated 1 in 200-year flow within the Braidwood Burn at this location is 11.47m3/s. The ReFH2 analysis is presented in Appendix A.

3.4.3.2     Culvert Capacity Assessment

The proposed bottomless arch culvert will be constructed from corrugated steel arch multiplate and will have a span and rise of 8 and 4m respectively. The span will entirely encompass the existing width of the Braidwood Burn channel (approximately 3-4m wide).

The proposed crossing details drawing are presented in Appendix B.

Given that the proposed culvert’s cross-sectional area is significantly larger than the channel cross-sectional area, it is proposed to provide culvert capacity estimates using two methods to demonstrate that there is sufficient capacity to convey the 1-200 year flow.

The first methodology for estimating the culvert capacity is through the application of the Colebrook-White equation for calculating the flow within a pipe. This equation has its limitations in this application as it is generally for calculating flows within full pipes with a single pipe roughness assumed. The equation has been used to initially estimate full pipe flow (using the 8m span as the pipe diameter) and halving this result to estimate the flow within the culvert.

As a conservative approach, the pipe roughness used within the equation has been based on the worst-case roughness for this application, the rock armour along the base of culvert length. The equivalent pipe roughness for this material has been estimated to be 750mm. Comparatively, the roughness for the corrugated steel is approximately 30mm.

The existing slope along the watercourse over the proposed extent of the culvert has been estimated to be 1 in 40 using site survey information. However, as a conservative estimate, the capacity calculation will use a slope of 1 in 100.

A summary of the parameters and results is shown below in Table 6.

Table 6 :
Colebrook-White Equation Summary

Table 6 – Colebrook-White Equation Summary

The conservative estimate above indicates that the culvert would have a capacity of approximately 100m3/s. This estimate is almost 10 times greater than the estimated peak flow in the watercourse for the 1 in 200-year event. There is therefore a high confidence in this estimate that the culvert would be more than capable to convey the design flow.

The second methodology for estimating the culvert’s ability to convey the design flow is to undertake a cross-sectional comparison of the culvert and the floodplain within the valley. For this assessment, the capacity of the channel itself has been ignored to provide a conservative estimate as the required cross-sectional of the floodplain to convey the design flow will be greater given its higher roughness value than the channel. From the topographic survey, the following parameters of the valley have been estimated:

       Floodplain width (i.e., valley base, ignoring channel) – 11m

       Lefthand valley slope (looking downstream) – 1 in 4

       Right valley slope (looking downstream) – 1 in 1.3

       Longitudinal valley slope – 1 in 40

The above information has been used to estimate the required cross-sectional area to convey the design flow using the open channel Manning’s Equation. For the equation, a Manning’s Coefficient of Roughness of 0.07 has been used which is equivalent to a floodplain with medium to dense brush. Similar to the previous assessment, a conservative slope estimate of 1 in 100 has been used despite accurate topographic survey information.

A copy of the Manning’s Equation results are provided in Appendix C.

The Manning’s equations indicates that a cross-sectional area of approximately 11m2 is required to convey the design flow within the floodplain. Comparatively the cross-sectional area of the bottomless arch culvert is approximately 50m2 (excluding channel capacity).  Similar to the previous assessment, this methodology indicates that the bottomless arch culvert has a considerable excess capacity to easily convey the design flows without restriction.

This Further Assessment therefore shows that there is negligible risk to the onshore cable route watercourse crossing with respect to fluvial flooding. 

3.4.4           Flooding from Land Assessment

The flood risk screening assessment has identified a ‘Medium’ flood risk to the onshore substation from overland flow from the upgradient natural catchment.

The proposed drainage strategy for the substation (see EIAR Technical Appendix 11.2) provides upgradient cut-off drains to negate the risk of upgradient surface water runoff flowing onto the platform – refer to Appendix 11.2 for further details. Additionally, the proposed drainage strategy will route surface water runoff away from the existing surface water flooding issue area and thus provide a betterment to this pre-existing flooding.

This Further Assessment therefore shows that there is a low risk to the onshore substation from flooding from land.