Glossary
Term |
Definition |
Anthropogenic |
Man-made |
Berwick Bank |
Berwick Bank Wind Farm (encompasses the revised project boundaries of Berwick Bank and Marr Bank wind farms). (Figure 1.1 Open ▸ ) |
Bryozoan |
Aquatic invertebrate |
Covid-19 |
Pandemic caused by the coronavirus (SARS-CoV-2) |
Cumulative Effects |
Changes to the environment caused by a combination of present and future projects, plans or activities |
Designed In Measures |
Measures included in the design of a proposed development that help to reduce the impact of the Proposed Development. |
Digital Aerial Surveys |
Digital surveys carried out by aeroplane |
Echolocation |
The location of objects by reflected sound |
EIA Regulations |
Collectively the term used to refer to The Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2017; The Marine Works (Environmental Impact Assessment) (Scotland) Regulations 2017; The Marine Works (Environmental Impact Assessment) Regulations 2007; The Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2017. |
Ensonification |
To fill an area with sound |
Environmental Impact Assessment |
Assessment of the consequences to the environment of a plan, project or activity |
Epibenthic |
Flora or fauna that live on the seabed |
Epifaunal |
Animals living on the seabed |
EUSeaMap |
Broadscale habitat maps produced by EMODnet for Europe |
Former Firth of Forth Zone |
Suitable areas for the development of offshore wind assessed through a statutory process of Strategic Environmental Assessment (SEA) undertaken by Department of Energy and Climate Change (DECC), now Department for Business, Energy and Industrial Strategy (BEIS). |
Geodiversity |
Geological materials, forms and processes that shape the Earth |
Grab sample |
A technique used to sample benthic flora and fauna |
Important Ecological Feature |
Ecologically important features that require further consideration within the EIA process |
Initial Berwick Bank Wind Farm Proposal |
The original proposal for Berwick Bank Wind Farm in respect of which a Scoping Opinion was received from the Scottish Ministers in March 2021 |
Infaunal |
Animals that live in the sediments occurring on the sea floor |
Macrobenthic |
Animals that inhabit the bottom of the water column |
Marine Licence |
Licence granted under either the Marine and Coastal Access Act 2009 or the Marine (Scotland) Act 2010 |
Marine Scotland |
Organisation who’s purpose is to manage Scotland’s seas |
Marine Strategy Framework |
The European Union Directive (2008/56/EC) seeking to achieve good environmental status (GES) in Europe’s seas by 2020. |
MARPOL |
International Convention for the Prevention of Pollution from Ships |
Marr Bank |
Marr Bank Wind Farm (formerly Seagreen 3 Offshore Wind Farm) |
Moraine |
Accumulation of glacial debris |
MRSea |
Statistical modelling of Bird and Cetacea Distributions in Offshore Renewables Development Areas |
Natura 2000 |
A network of core breeding and resting sites for rare and threatened species and habitats |
Nursery Ground |
An area that is suitable for young fish to grow and live |
Offshore EIA Scoping Report |
Scoping Report assessing all of the offshore infrastructure of the Proposed Development, seaward of MHWS |
Onshore EIA Scoping Report |
Scoping Report assessing all onshore infrastructure of the Project landward of MLWS |
OSPAR Convention |
The Convention for the Protection of the Marine Environment of the North-East Atlantic |
Permanent Threshold Shift (PTS) |
Irreversible loss of hearing |
Phase 1 |
Development of two offshore wind farms: Seagreen Alpha and Seagreen Bravo |
Planning Permission |
Permission granted under the Town and Country Planning (Scotland) Act 1997 for all Project infrastructure located landward of MLWS |
Project |
Berwick Bank Wind Farm |
Project Design Envelope |
Project Parameters that are assessed as part of the EcIA process for a proposed development |
Proposed Development |
Offshore components of the Project which are the subject of this EIA Scoping request |
Scottish Ministers |
The devolved government of Scotland |
SeaBORD |
A tool to estimate the fate of birds displaced by offshore renewable development |
Seagreen Alpha/Bravo |
Seagreen Alpha and Seagreen Bravo Offshore Wind Farms |
Section 36 consent |
Consent which can be granted under section 36 of the Electricity Act 1989 for the construction or extension, and operation, of an electricity generating stations |
SOLAS |
International Convention for the Safety of Life at Sea |
Spawning Ground |
Area where a fish leaves their eggs for fertilization and development |
Temporary Threshold Shift (TTS) |
Reversible and temporary hearing loss |
Zone of Theoretical Visibility |
Tool to identify the likely extent of visibility of a proposed development |